index
:
ayatana-indicator-application
main
release-build
release-builds
Ayatana Indicator Application Service
about
summary
refs
log
tree
commit
diff
log msg
author
committer
range
path:
root
/
tests
Commit message (
Expand
)
Author
Age
Files
Lines
*
Import upstream version 0.2.91
Ken VanDine
2011-01-14
12
-1953
/
+142
|
\
|
*
fix bug with gvariant string; port test
Michael Terry
2011-01-12
2
-26
/
+101
|
*
port to gdbus
Michael Terry
2011-01-11
1
-6
/
+2
|
*
Fixing up the test so it builds and runs
Ted Gould
2010-12-02
2
-3
/
+4
|
*
Dropping the library tests
Ted Gould
2010-12-02
10
-1452
/
+3
*
|
Import upstream version 0.2.90
Ted Gould
2010-12-07
1
-2
/
+5
|
\
|
*
|
Import upstream version 0.2.5
Ted Gould
2010-08-19
1
-1
/
+1
|
\
|
|
*
Fix approver for function change
Ted Gould
2010-08-19
1
-1
/
+1
*
|
Import upstream version 0.2.4
Ted Gould
2010-08-12
2
-0
/
+135
|
\
|
|
*
More signalling tests.
Ted Gould
2010-08-03
1
-0
/
+28
|
*
Setting up a basic signals test
Ted Gould
2010-08-03
1
-0
/
+42
|
*
Stupid reverse logic in the string comparison.
Ted Gould
2010-08-03
1
-7
/
+7
|
*
Adding a test to set the label and guides a bunch.
Ted Gould
2010-08-03
1
-0
/
+63
*
|
Import upstream version 0.2.3
Ted Gould
2010-07-15
3
-9
/
+268
|
\
|
|
*
Add a fail timeout so this test can't block.
Ted Gould
2010-07-12
1
-0
/
+9
|
*
Adding in setting the environment variable to adjust the timeout to be twice ...
Ted Gould
2010-07-12
1
-0
/
+1
|
*
Need the built headers too
Ted Gould
2010-07-09
1
-1
/
+2
|
*
Oops, with a menu we're all GTK now.
Ted Gould
2010-07-09
1
-1
/
+1
|
*
Building up to a formal test
Ted Gould
2010-07-09
1
-0
/
+9
|
*
Filling out the approve function.
Ted Gould
2010-07-09
1
-0
/
+6
|
*
Filling out the approver prototype
Ted Gould
2010-07-09
1
-4
/
+7
|
*
Building an application indicator too!
Ted Gould
2010-07-09
2
-1
/
+15
|
*
Making the registration async to clean things up, and async is better anyway.
Ted Gould
2010-07-09
1
-8
/
+16
|
*
Some more error handling and better debug messages.
Ted Gould
2010-07-09
1
-3
/
+24
|
*
Helpful debug info
Ted Gould
2010-07-09
1
-1
/
+5
|
*
Okay, so now we're detecing when the watcher comes up, and registering oursel...
Ted Gould
2010-07-09
1
-3
/
+44
|
*
Adding a new sample approver
Ted Gould
2010-07-09
2
-0
/
+90
*
|
Import upstream version 0.2.1
Ted Gould
2010-06-21
4
-6
/
+13
|
\
|
|
*
More time for initial fallback.
Ted Gould
2010-06-11
1
-1
/
+1
|
*
Increase the timeouts, but make it so that the watcher shutsdown when seen.
Ted Gould
2010-06-11
3
-4
/
+11
|
*
Increasing timeout to hopefully make it work on Hudson with load.
Ted Gould
2010-06-11
1
-1
/
+1
*
|
Import upstream version 0.2.0
Ted Gould
2010-06-03
7
-6
/
+15
|
\
|
|
*
Removing the libappindicator directory to make things simpler
Ted Gould
2010-04-29
6
-6
/
+6
*
|
Import upstream version 0.0.19
Ted Gould
2010-04-01
1
-0
/
+1033
|
/
*
Fixing tests to use GTK for icon theme fixes.
Ted Gould
2010-03-25
2
-1
/
+2
*
Adding a two second wait to make seting up Xvfb more reliable. This is simil...
Ted Gould
2010-03-11
1
-0
/
+1
*
Lengthing kill timer to be a little longer for slow systems.
Ted Gould
2010-03-02
1
-1
/
+1
*
Fall out of the while, sometime, if we really think it's not recoverable.
Ted Gould
2010-02-22
1
-1
/
+8
*
Trying to make the test a little more robust by waiting for the other process...
Ted Gould
2010-02-22
2
-4
/
+33
*
Adding a mock server here as well
Ted Gould
2010-02-19
1
-0
/
+30
*
Putting in a mock watcher so we don't fall back.
Ted Gould
2010-02-19
2
-0
/
+33
*
Making sure our new tests with gtk_init() in them have an X server to talk to.
Ted Gould
2010-02-10
1
-2
/
+4
*
Building a menu so this item will show
Ted Gould
2010-02-10
1
-1
/
+7
*
Changing to ID based naming and setting a menu to get init
Ted Gould
2010-02-10
2
-5
/
+11
*
Making sure the client has time to setup.
Ted Gould
2010-02-06
1
-0
/
+3
*
Changing to 100 instead of 1000
Ted Gould
2010-02-06
2
-2
/
+2
*
Lengthening the time a little bit to make sure we don't miss messages.
Ted Gould
2010-02-06
2
-2
/
+3
*
Now setting status ALOT
Ted Gould
2010-02-06
1
-8
/
+22
*
Loose the timeout
Ted Gould
2010-02-06
1
-2
/
+0
*
Adjusting the status test to watch for toggles
Ted Gould
2010-02-06
1
-182
/
+46
[next]