index
:
libayatana-appindicator
main
master
pr/avoid-path-max
pr/fix-unit-tests
pr/travis-ci
release-builds
Ayatana Application Indicators Shared Library
about
summary
refs
log
tree
commit
diff
log msg
author
committer
range
path:
root
/
tests
/
Makefile.am
Commit message (
Expand
)
Author
Age
Files
Lines
*
Removing the approver test and switching the build flags
Ted Gould
2010-12-02
1
-44
/
+16
*
Adding in setting the environment variable to adjust the timeout to be twice ...
Ted Gould
2010-07-12
1
-0
/
+1
*
Need the built headers too
Ted Gould
2010-07-09
1
-1
/
+2
*
Building up to a formal test
Ted Gould
2010-07-09
1
-0
/
+9
*
Building an application indicator too!
Ted Gould
2010-07-09
1
-1
/
+2
*
Adding a new sample approver
Ted Gould
2010-07-09
1
-0
/
+16
*
Increase the timeouts, but make it so that the watcher shutsdown when seen.
Ted Gould
2010-06-11
1
-1
/
+1
*
Fixing tests to use GTK for icon theme fixes.
Ted Gould
2010-03-25
1
-0
/
+1
*
Making sure our new tests with gtk_init() in them have an X server to talk to.
Ted Gould
2010-02-10
1
-2
/
+4
*
Typo
Ted Gould
2010-02-05
1
-1
/
+1
*
Adding a test for changing the status. Just a copy of the standard dbus test.
Ted Gould
2010-02-05
1
-0
/
+43
*
Wrong srcdir
Ted Gould
2010-02-04
1
-1
/
+1
*
Wrong filename
Ted Gould
2010-02-04
1
-1
/
+3
*
Getting run-xvfb on the tests
Ted Gould
2010-02-04
1
-1
/
+2
*
Adding the fallback test to the suite
Ted Gould
2010-01-12
1
-0
/
+2
*
Adding in the item side of things.
Ted Gould
2010-01-12
1
-1
/
+1
*
Getting the start of the fallback tests in place.
Ted Gould
2010-01-12
1
-0
/
+35
*
De-customizing the directory stuff.
Ted Gould
2009-11-30
1
-35
/
+35
*
Merging in changes on trunk. Resolving a conflict.
Ted Gould
2009-11-24
1
-5
/
+10
|
\
|
*
Put the cleanup of gtester on the wrong variable.
Ted Gould
2009-11-04
1
-2
/
+2
|
*
Put the gtester test under a dbus-test-runner to ensure that we have a sessio...
Ted Gould
2009-11-03
1
-5
/
+10
*
|
Adding a defualt file for a little appliction that'll grow into a full app.
Ted Gould
2009-11-09
1
-1
/
+18
|
/
*
Switching to using a little autotest as well.
Ted Gould
2009-10-22
1
-4
/
+18
*
Adding in two little client server binaries for testing the custom indicator.
Ted Gould
2009-10-22
1
-1
/
+45
*
Turning on verbose output and showing the status of all tests.
Ted Gould
2009-10-21
1
-1
/
+1
*
Now we're building a test, woot!
Ted Gould
2009-10-20
1
-1
/
+24
*
Tests directory.
Ted Gould
2009-10-20
1
-0
/
+3