index
:
libayatana-appindicator
main
master
pr/avoid-path-max
pr/fix-unit-tests
pr/travis-ci
release-builds
Ayatana Application Indicators Shared Library
about
summary
refs
log
tree
commit
diff
log msg
author
committer
range
path:
root
/
tests
Commit message (
Expand
)
Author
Age
Files
Lines
*
Adding a desktop file for testing
Ted Gould
2010-11-08
2
-1
/
+26
*
Adding in a couple of desktop tests
Ted Gould
2010-11-08
1
-0
/
+18
*
Fix approver for function change
Ted Gould
2010-08-19
1
-1
/
+1
*
More signalling tests.
Ted Gould
2010-08-03
1
-0
/
+28
*
Setting up a basic signals test
Ted Gould
2010-08-03
1
-0
/
+42
*
Stupid reverse logic in the string comparison.
Ted Gould
2010-08-03
1
-7
/
+7
*
Adding a test to set the label and guides a bunch.
Ted Gould
2010-08-03
1
-0
/
+63
*
Add a fail timeout so this test can't block.
Ted Gould
2010-07-12
1
-0
/
+9
*
Adding in setting the environment variable to adjust the timeout to be twice ...
Ted Gould
2010-07-12
1
-0
/
+1
*
Need the built headers too
Ted Gould
2010-07-09
1
-1
/
+2
*
Oops, with a menu we're all GTK now.
Ted Gould
2010-07-09
1
-1
/
+1
*
Building up to a formal test
Ted Gould
2010-07-09
1
-0
/
+9
*
Filling out the approve function.
Ted Gould
2010-07-09
1
-0
/
+6
*
Filling out the approver prototype
Ted Gould
2010-07-09
1
-4
/
+7
*
Building an application indicator too!
Ted Gould
2010-07-09
2
-1
/
+15
*
Making the registration async to clean things up, and async is better anyway.
Ted Gould
2010-07-09
1
-8
/
+16
*
Some more error handling and better debug messages.
Ted Gould
2010-07-09
1
-3
/
+24
*
Helpful debug info
Ted Gould
2010-07-09
1
-1
/
+5
*
Okay, so now we're detecing when the watcher comes up, and registering oursel...
Ted Gould
2010-07-09
1
-3
/
+44
*
Adding a new sample approver
Ted Gould
2010-07-09
2
-0
/
+90
*
More time for initial fallback.
Ted Gould
2010-06-11
1
-1
/
+1
*
Increase the timeouts, but make it so that the watcher shutsdown when seen.
Ted Gould
2010-06-11
3
-4
/
+11
*
Increasing timeout to hopefully make it work on Hudson with load.
Ted Gould
2010-06-11
1
-1
/
+1
*
Removing the libappindicator directory to make things simpler
Ted Gould
2010-04-29
6
-6
/
+6
*
Fixing tests to use GTK for icon theme fixes.
Ted Gould
2010-03-25
2
-1
/
+2
*
Adding a two second wait to make seting up Xvfb more reliable. This is simil...
Ted Gould
2010-03-11
1
-0
/
+1
*
Lengthing kill timer to be a little longer for slow systems.
Ted Gould
2010-03-02
1
-1
/
+1
*
Fall out of the while, sometime, if we really think it's not recoverable.
Ted Gould
2010-02-22
1
-1
/
+8
*
Trying to make the test a little more robust by waiting for the other process...
Ted Gould
2010-02-22
2
-4
/
+33
*
Adding a mock server here as well
Ted Gould
2010-02-19
1
-0
/
+30
*
Putting in a mock watcher so we don't fall back.
Ted Gould
2010-02-19
2
-0
/
+33
*
Making sure our new tests with gtk_init() in them have an X server to talk to.
Ted Gould
2010-02-10
1
-2
/
+4
*
Building a menu so this item will show
Ted Gould
2010-02-10
1
-1
/
+7
*
Changing to ID based naming and setting a menu to get init
Ted Gould
2010-02-10
2
-5
/
+11
*
Making sure the client has time to setup.
Ted Gould
2010-02-06
1
-0
/
+3
*
Changing to 100 instead of 1000
Ted Gould
2010-02-06
2
-2
/
+2
*
Lengthening the time a little bit to make sure we don't miss messages.
Ted Gould
2010-02-06
2
-2
/
+3
*
Now setting status ALOT
Ted Gould
2010-02-06
1
-8
/
+22
*
Loose the timeout
Ted Gould
2010-02-06
1
-2
/
+0
*
Adjusting the status test to watch for toggles
Ted Gould
2010-02-06
1
-182
/
+46
*
Typo
Ted Gould
2010-02-05
1
-1
/
+1
*
Adding a test for changing the status. Just a copy of the standard dbus test.
Ted Gould
2010-02-05
3
-0
/
+362
*
Wrong srcdir
Ted Gould
2010-02-04
1
-1
/
+1
*
Wrong filename
Ted Gould
2010-02-04
1
-1
/
+3
*
Getting run-xvfb on the tests
Ted Gould
2010-02-04
2
-1
/
+9
*
Changing the category in the fallback test as well.
Ted Gould
2010-01-27
1
-1
/
+1
*
Changing strings in the test suite as well.
Ted Gould
2010-01-27
1
-2
/
+2
*
Really we should have gotten the final cleanup unfallback, which we weren't t...
Ted Gould
2010-01-13
1
-3
/
+6
*
Making sure to return a value so that unfallback gets called.
Ted Gould
2010-01-13
1
-1
/
+1
*
Adding a menu so that the app indicator will init
Ted Gould
2010-01-12
1
-1
/
+4
[next]